Greenhouse Construction


The 2.5 acre Greenhouse pad, surrounding site, and Headhouse areas are graded to design specifications. Diversion of rainwater from the roofs and parking lots were included as part of the stormwater management requirements. The total area affected was eight acres.


Dr. Thomas Handwerker, Director
email: Tshandwerker@mail.umes.edu